Skip to content
  • Add anything here or just remove it...
Công Ty Luật TNHH Global Vietnam LawyersCông Ty Luật TNHH Global Vietnam Lawyers
    • Home
    • ABOUT THE FIRM
      • About Us
      • Honor Ranks & Awards
      • Strategy Partnership
    • Practices
    • PEOPLE
    • CLIENTS
      • OUR CLIENTS
      • CLIENT EVALUATION
      • Recent Major Projects
    • Publications
      • Articles
      • Legal Updates
    • News
      • News & Events
      • Job Opportunities
    • Contact
    • English
    • Tiếng Việt
    • English
    • Tiếng Việt
Legal Alert April 2024 EN

Legal Alert | April 2024

By: Quỳnh Anh created 20/04/2024

On 1 April 2024, the Prime Minister issued Decision No. 262/QD-TTg approving the Plan to implement the National Electricity Development Plan for the period 2021 – 2030, with a vision to 2050 (“Power Planning VIII”) with 4 main purposes: (i) meeting electricity needs for socio-economic development in each period, ensuring the issue of electricity stays  one step ahead; (ii) transitioning energy from fossil fuels to new energy sources and renewable energy, contributing to the net zero emissions target by 2050; (iii) attracting investment in electricity development; and (iv) orienting ministries and branches to effective implementation of the Power Planning VIII (“Plan”).

The following are some main contents of the Plan in which energy investors are especially interested.

1. List of power source projects until 2030

No. Power sources Total capacity (MW) Regulations of Power Planning VIII
Important power source projects, investment priority
1 Domestic gas thermal power 14,930 Table 1 of Appendix III
2 LNG thermal power 22,400 Table 2 of Appendix III
3 Coal thermal power 30,127 Table 3 of Appendix III
4 Cogeneration power source, power source using residual heat, blast furnace gas, by-products of technological lines 2,700 Table 5 of Appendix III
5 Hydropower (medium and large projects) 29,346 Table 6 of Appendix III
6 Pumped-storage hydroelectricity 2,400 Table 7 of Appendix III
Renewable energy power projects
1 Offshore wind power 6,000 Table 1 of Appendix II
2 Onshore wind power (onshore and nearshore wind power) 21,880 Table 9 of Appendix II
3 Hydropower (small new construction projects) 29,346 Table 10 of Appendix II
4 Biomass electricity 1,088 Table 11 of Appendix II
5 Electricity produced from trash 1,182 Table 12 of Appendix II
6 Rooftop solar power (self-produced, self-consumed) 2,600 Table 6 of Appendix II
7 Storage battery 300 Table 8 of Appendix II
Other types of power sources
1 Flexible power sources 300 –
2 Imported from Laos 5,000 – 8,000 –
3 Exporting electricity from the Central and Southern regions 5,000 – 10,000 –
4 New types of energy (green hydrogen, green ammonia) 5,000 –

2. Regional power transmission and grid connection projects

Appendix V of the Plan provides a list of important transmission grid projects, investment priorities, and power grids linked with neighboring countries. The volume of “backup power grid generating lines and transformer stations” in this Appendix V is used to:

  • deploy new construction power transmission grid projects or new additional investment projects to improve transmission grid capacity, ability to control and operate power systems not yet included in the list of Power Planning VIII;
  • synchronously connect imported power source projects with Vietnam’s electricity system; and
  • synchronously connect (voltage level of 220 kV or higher) renewable energy power source projects in the Implementation Plan of Power Planning VIII with the national electricity system.

3. Research to build 2 inter-regional renewable energy industrial and service centres

The Plan sets the goal of researching and building two inter-regional renewable energy industrial and service centres by 2030 as follows:

  • Renewable energy industry and service centre in the North with offshore wind power capacity of about 2,000 MW, onshore and coastal wind power capacity of about 500 MW.
  • Inter-regional renewable energy industry and service centre in the South Central – Southern region with offshore wind power scale of about 2,000 – 2,500 MW, onshore and coastal wind power of about 1,500 – 2,000 MW.

4. Investment capital needs until 2030

  • Total public investment capital is VND29,829 billion, including: (i) Investment capital for priority projects/schemes on perfecting legal policies and strengthening the power sector is about VND50 billion; and (ii) Investment capital for the rural power supply program in mountainous and island areas being about VND29,779 billion.
  • Total other capital than public investment capital is VND3,223 trillion (equivalent to USD134.7 billion), used for power sources and transmission grids in 2 periods of 2021 – 2025 and 2026 – 2030. In which, investment in power source accounts for about VND2,866.5 trillion (equivalent to USD 119.8 billion); and investment in power transmission grid accounts for about VND356.5 trillion (equivalent to USD14.9 billion).

Thus, it can be seen that the Plan for implementing Power Planning VIII has provided a roadmap for organising the effective implementation of schemes/projects that meet the set goals of Power Planning VIII, meeting the electricity needs for socio-economic development in each period. That is an important legal basis for Vietnam to realise its energy development goals, and at the same time for investors to implement power projects. However, in order for the Plan to be quickly implemented, the tasks set out in the Plan need to be implemented immediately and synchronously by relevant units.

DOWNLOAD LEGAL ALERT

Related Posts

EN Legal Newsletter No. 11.2025

Legal Newsletter | November 2025

EN Legal Newsletter No. 10.2025

Legal Newsletter | October 2025

GVL Legal Alert Sep 2025 No.3 EN

Legal Alert | September 2025 – No.3

EN Legal Newsletter No. 09.2025

Legal Newsletter | September 2025

GVL Legal Alert Sep 2025 No.2 EN 1

Legal Alert | September 2025 – No.2

GVL Legal Alert Sep 2025 No.1 EN

Legal Alert | September 2025 – No.1

Search
Archives
  • Articles
  • Honor Ranks & Awards
  • Internship Program
  • Job Opportunities
  • Legal Updates
  • Major Deals
  • News & Events
  • Uncategorized

LET US PUT OUR KNOWLEDGE & EXPERIENCE
TO WORK FOR YOU

Contact us

HCMC – Head Office

Adress: 8th Floor, Centec Tower, 72-74 Nguyen Thi Minh Khai Street, Xuan Hoa Ward, HCMC, Vietnam

Hotline: +842836223555

Email: info@gvlawyers.com.vn

Hanoi - Branch Office

Adress: 10C1, 10th Floor, CDC Building, 25 Le Dai Hanh Street, Hai Ba Trung Ward, Hanoi, Vietnam

Hotline: +842836223555

Email: info@gvlawyers.com.vn

CONTACT US




    © 2025 Global Vietnam Lawyers
    © 2025 Global Vietnam Lawyers
    • Home
    • ABOUT THE FIRM
      • About Us
      • Honor Ranks & Awards
      • Strategy Partnership
    • Practices
    • PEOPLE
    • CLIENTS
      • OUR CLIENTS
      • CLIENT EVALUATION
      • Recent Major Projects
    • Publications
      • Articles
      • Legal Updates
    • News
      • News & Events
      • Job Opportunities
    • Contact